Standard Upflow without field modification. Downflow applications require field-installed downflow kit, sold separately.
Immersion-tested at 500 psi, followed by nitrogen pressurization and factory sealing to ensure optimal system integrity and long-term reliability.
Schrader provided for pressure assurance testing.
Refrigerant lines exit top of coil. Shrader valve on liquid line or internally mounted factory installed TXV for pressure assurance testing. Refrigerant and plumbing connections:
Liquid line: 3/4 ODS
Suction line: 3/4 in ODS on 1-1/2-ton to 3-ton 7/8 in ODS on 3-1/2-ton to 5-ton
Condensate Drains: 3/4 in NPT
Heavy duty plastic drain pans on most models, powder coated galvanized steel horizontal drain pans standard on all.
Fully insulated cabinets with faced insulation. Split access doors in front of cabinet for easy service access.
AHRI certifiable with all brands of A/C and heat pump systems.
ETL listed for R22 and 410A. ETL listed for R454B and R32 with Refrigerant Detection System (RDS)